The Birth of London's Underground
By
Adam Wood
On 16 May 1963, London celebrated the centenary of the birth of its
underground railway system. A gathering of invited transport officials from
various parts of the world was shown the modern Underground system at work
and in contrast, part of its history in review. The spectacle included a
replica of the very earliest train complete with passengers in the period
dress, and a parade of steam and electric rolling stock spanning 100 years
of operation. This was the beginning, the culmination of ideas born earlier,
when someone thought of trains that would start in London's suburbs, and then
plunge beneath the City's buildings and streets to disgorge passengers in its
very centre - or even take them under London to the other side. At about
this time a trip to the moon by aerial machine was also being considered, but
the overriding opinion of city gentlemen was that neither idea was worth a
second thought. It is difficult for us to imagine the scepticism of people
in those far-off days. They ridiculed the scheme -- not only the uneducated,
but also some we would regard as clear-thinking and level-headed. Perhaps
their attitude was not unreasonable, for only 20 years before the Underground
idea was broached, London had no railway at all. In 1836 the first line began
to work between Spa Road and Deptford, and it is probable that 20 years later
many Londoners had never even travelled on a train. They walked, or went on
horseback or took hackney carriages, whose speed was not much more than six
miles an hour. It is estimated that by 1850 over 750,000 people entered
London every day, either by main line railways or by road, and the streets
were becoming blocked. A plan was eventually evolved for an underground,
steam-operated railway nearly four miles long between Farringdon Street and
Bishop's Road, Paddington, following Farringdon Road and King's Cross Road to
King's Cross, and then following the course of Euston Road, Marylebone Road
and Praed Street to Paddington. Thus it would serve as a link between three
main-line railway terminii - the Great Western at Paddington, the London &
North Western at Euston, and the Great Northern at King's Cross. Farringdon
Street was chosen as a site for the eastern terminus principally because the
City Cattle Market, then occupying the site, was about to be moved to the
Caledonian Road at Islington. The constructional work began in 1860, and
within 2-and-a-half years it was completed -- a remarkable achievement
considering the amount of work involved in diverting sewers and gas and water
mains, with very little in the way of previous experience to guide the
constructors.
The Metropolitan Railway, as it became known, was built on the 'cut and cover'
method. Where it was to run under streets a huge trench was dug, lined with
brickwork and roofed over, and the streets relaid for surface traffic.
Although this method made chasms of certain streets and must have paralysed
traffic in their immediate vicinity, it made possible the construction of the
line without interfering to any great extent to private property. Some idea
of the amount of earth excavated for that early railway can be gathered by
those who know the Chelsea football ground at Stamford Bridge. The terraces
there was raised from that soil. The job of constructing such a railway would
be deemed an intricate one even today; but it was done successfully, for the
original massive brickwork is still in good condition. The only real setback
occurred when the Fleet Ditch Sewer burst and flooded the workings to a depth
of 10ft as far as King's Cross, but even this proved only a temporary setback.
Mr. and Mrs. Gladstone and other notables rode through the echoing tunnels on
Private View Day in open trucks (see above right). Then, to celebrate the
opening of the railway on 10 January 1863, many hundreds of people were invited
to attend a great banquet at Farringdon Street Station - and the trains, as
they approached the station, were heralded by music from a band! The public
rode in closed carriages -- only on the first trial trips were open trucks
used.
It was foreseen at the outset that the Metropolitan would eventually connect
with other railway systems, and subsequently this occurred; the Great Western
operated a service from Windsor to Farringdon Street via a junction at
Paddington; the Midland, Great Northern and Great Eastern Railways connected
through underground junctions at King's Cross and Liverpool Street respectively,
and the London, Chatham & Dover Railway was linked at Farringdon Street by a
short connecting line from Blackfriars.
9,500,000 Londoners were carried in the first year, 12,000,000 the second,
and each year after that more and more. Its popularity was further enhanced
by the addition of two trains exclusively for workmen. One ran to the City
in the morning and the other ran out of the City in the evening, carrying
workmen for a fare of one penny for each single journey. The first section
of the District Railway was opened in late 1868 between South Kensington and
Westminster, a distance of just over two miles. For its first 2-and-a-half
years it was worked by Metropolitan stock, under an agreement between the two
companies, but in the meantime it had extended its lines eastward under
Victoria Embankment to Blackfriars. In the east the Metropolitan had been
busy tunnelling towards Aldgate. The purpose of these short and enormously
expensive City extensions was eventually to link the Metropolitan with the
District, and so form the Inner Circle line, over which both railways intended
to run services to their mutual benefit. To effect this most important link
each company agreed to build part of the connecting line. Its length was just
1 mile 10 chains, connecting at a junction with the District at Mansion House,
running due east to Mark Lane and finally curving north to make a junction
with the Metropolitan at Aldgate Station. By its completion in 1884 an Inner
Circle line, already made continuous in the west by a junction at South
Kensington, became reality. This became the Circle Line. The Twin Lines
system also connected in that year with the East London Railway, 4-and-a-half
miles extending from Shoreditch to New Cross, where it forked to serve
respectively the South Eastern and the London, Brighton & South Coast
stations. This new link enabled through trains to be run between Hammersmith
and New Cross via a spur tunnel at Whitechapel (opened 6 October 1884) and
the Thames Tunnel. The steam locomotives of both the Metropolitan and the
District railways were expressions of a single design -- the 4-4-0Ts built by
Beyer, Peacock & Company. All the locomotives built from 1871 (44 in all)
were still in 1905 when electrification was accomplished. Their olive green
colour combined with polished brass dome covers gave the locomotives a smart
appearance even though they operated in smoke-filled tunnels. In one
particular they were different for the period, in that they were fitted with
condensing gear, which gave the driver a means of diverting exhaust steam
from the chimney outlet into the water tanks, where the exhaust condensed,
leaving the tunnels more or less clear of smoke and vapour. The original
passenger coaches were divided into first, second and third class compartments,
the first being fitted with carpets, mirrors and well-upholstered seats.
Furnishings decreased in elegance according to the class, as did the space
allotted per person, and we can imagine that the third-class passenger was
glad to resurface, stiff after a ride during which all the windows had to be
kept closed.
One of the biggest problems confronting the engineers of the underground
steam railways was to provide and maintain a supply of breathable air in
tunnels and stations. The Metropolitan engines burned coke, which is clean
but gives off poisonous fumes, and after abortive trials with additional
ventilators at the stations, the railway went over to coal, with the
immediate result of an extremely smoky atmosphere. As a remedy, certain
openings originally provided in the covered way at King's Cross and elsewhere
for lighting purposes were adapted as smoke vents, and finally 'blow holes'
were bored all along the route between King's Cross and Edgware Road. They
were covered by gratings in the roadways above, and were prone to sudden
belching of steamy vapour which startled the passing horses. So much about
the Metropolitan and District lines were trial and error that it is not
surprising that their fortunes should fluctuate -- the District Railway in
particular had many lean years, but its prospects were brightened by events
that its promoters could hardly have foreseen. These were the exhibitions
held annually at South Kensington, and followed by the famous exhibitions at
Earls Court. The great American and Buffalo Bill show there in 1887 was
immensely popular, and the District Railway took full advantage of these
displays and issued combined rail and entry tickets. The electrification of
the Metropolitan and District systems in 1905 was easily the most important
event in their respective lives. It was almost a case of electrification or
die, for as steam lines their position was deteriorating rapidly in the face
of competition from the recently-opened tube railways. Electrification was
necessarily a joint undertaking since Inner Circle Metropolitan trains ran
over part of the District territory, and in any case their interests had too
much in common to allow one railway to electrify with the other.
Eventually the two lines decided to electrify the up and down sections of line
between Earls Court and High Street Kensington, as an experiment. This was in
1899, and in the following year a six-coach train comprising two motor coaches
and four trailers was tested against a steam-hauled train. The electric train
came out of the test with flying colours, and was run on this section of line
as a passenger train, the fare being one shilling, against 2d to 4d on the
steam. Although by this time both companies had decided to go ahead with
electrification, it was not to be a straightforward matter of getting the job
done quickly, for a dispute arose between the two companies as to the
particular electrical system to be adopted. The Metropolitan favoured the
Ganz system of high-tension alternating current, which was to be generated at
11-12,000V and stepped down by static transformers to 3,000V, at which
pressure it was to be transferred to overhead copper wire conductors. The
Metropolitan's advisers maintained that this system would prove most
economical, since it would require no substations and no heavy conductor rail
such as would be necessary with a system using low-tension direct current.
Another advantage they claimed was that the static transformers required no
attendants and could be locked in a room and left to work themselves. The
District, on the other hand, favoured the British Thomson-Houston Company's
low-tension system by which direct current was to be fed to conductor rails
on the track. The matter was complicated by the fact that the Metropolitan
was then financially sound and therefore powerful enough to insist, if
necessary, on its own favoured electrical system; the District on the other
hand was practically bankrupt but sincerely believed in the superiority of
its system. At this stag there appeared on the scene Charles Tyson Yerkes,
an American who for ten years had financed the equipping of elevated railroads
and electric tramways in America. The controlling group of shareholders of
the District Railway stock had turned to him for financial help, and their
negotiations resulted in the formation of the Metropolitan District Electric
Traction Co. Ltd, a move which improved the District's financial position and
gave it equal bargaining powers with the Metropolitan Railway. Yerkes refused
to act on the expert advice which favoured the Metropolitan system, and even
went so far as to visit Budapest to see the Ganz system, which had been
applied to a short section of railway there. He did not see it because by this
time the experimental section of line had been dismantled, but he did see the
67-mile Valtellina line, which ran from Lecco alongside Lake Como to Sondrio, and whether he was influenced or
not as a result, he finally decided that overhead conductors would not suit
London systems. The matter was now a really serious issue between the two
companies, and they finally went to arbitration -- the Press making a great
play of the controversy meanwhile. After a long sitting the tribunal
appointed by the Board of Trade gave judgement for the D.C. system, and the
tremendous jobs of building great power stations at Lots Road and Neasden and
many substations, and laying miles of cable, were at last put in hand. Some
26 miles in all of the Metropolitan were electrified in three years, a very
creditable performance considering the line was clear for workmen for only
about six hours out of every 24. The length of the District to be electrified
was even more. At first an experimental electrified line between Ealing and
South Harrow was laid down and used both for testing the installation and for
training crews to operate the new electric trains. While this was going on
the work of electrification was proceeding steadily, and eventually on 22
September 1905 the last steam train puffed around the Inner Circle. Not many
months after its exit the whole programme of electrification of both railways
was completed. Long, well-lit saloon coaches for passengers replaced the
discomforts of dim and stuffy compartment coaches. It was as if the
authorities wished to wipe the memories of steam trains from the minds of
their passengers, for stations and tunnels were thoroughly cleaned of
accumulated layers of soot and grime, and there was much repainting of both
lines as soon as possible afterwards. The two companies were eager to make
their railways more attractive than those of the competitive tube lines.
Opening dates of sections of line until 1900:
- Metropolitan Railway 10 January 1863
- Farringdon to Paddington 1 October 1863
- Connection to Great Northern Railway at King's Cross 13 June 1864
- Paddington to Hammersmith 23 December 1865
- Farringdon to Moorgate 13 April 1868
- Baker Street to Swiss Cottage 1 October 1868
- Paddington to Gloucester Road 24 December 1868
- Gloucester Road to South Kensington 1 February 1875
- Moorgate to Liverpool Street 18 November 1876
- Liverpool to Aldgate 30 June 1879
- Swiss Cottage to West Hampstead 24 November 1879
- West Hampstead to Willesden Green 2 August 1880
- Willesden Green to Harrow-on-the-Hill 25 September 1882
- Aldgate to Tower Hill 6 October 1884
- Liverpool Street to Whitechapel 25 May 1885
- Harrow-on-the-Hill to Pinner 1 September 1887
- Pinner to Rickmansworth 8 July 1889
- Rickmansworth to Chesham 1 September 1892
- Chalfont and Latimer to Aylesbury 1 January 1894
- Stoke Mandeville to Aylesbury District Railway 1 October 1868
- High Street Kensington to Gloucester Road 24 December 1868
- Gloucester Road to Westminster 12 April 1869
- Gloucester Road to West Brompton 30 May 1870
- Westminster to Blackfriars 3 July 1871
- Blackfriars to Mansion House 3 July 1871
- High Street Kensington to Earl's Court 9 September 1874
- Earl's Court to Hammersmith 1 June 1877
- Hammersmith to Richmond 1 July 1879
- Turnham Green to Ealing Broadway 1 March 1880
- West Brompton to Putney Bridge 1 May 1883
- Acton Town to Hounslow Town 21 July 1884
- Osterley to Hounslow West 6 October 1884
- Mansion House to Whitechapel Inner Circle complete and junction
made with East London Railway at Whitechapel 3 June 1889
- Putney Bridge to Wimbledon East London Railway 1 October 1884
Underground services operated Whitechapel to New Cross and New Cross Gate.
Source: "London's Underground" by H. F. Howson